Moving a machine or a whole line takes more than transport. Every stage has to be planned so production stops for as little time as possible.

Main stages

  • Inventory and documentation: photos, diagrams, labelled connections
  • Preparing the new site: foundations, utilities, access
  • Controlled dismantling and packing for transport
  • Transport and lifting with suitable equipment
  • Reinstallation, alignment and reconnection
  • Testing and commissioning with the manufacturer or client

Where delays usually happen

Most delays come from an unprepared new site: unfinished foundations, missing utilities or poor access for lifting equipment. Checking these points before dismantling saves whole days.

In short

A successful relocation has a written plan, clear responsibilities and a schedule coordinated with production. We provide crews for machinery installation and reinstallation, based on an on-site assessment; contact us to plan your move.